You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 38 Next »

June 2013

June 17th, 2013

  • Pegasus Development
    • the dax job handling is completed.
    • update on ligo front.
    • condor priorities for local universe jobs
      • not handled right now.
      • gideon has a ticket open for them.
    • gideon observation of s3
      • scalable but not good latency or
  • Pegasus Lite Paper
    • mats is almost done with the runs. to grep through the runs to get the intermediate files in and out of S3
    • not done the S3 caching for rosetta as yet. still not sure. too much work for the time remaining.
    • mats did do the runs with task clustering. he got better numbers and saw a difference in case of rosetta.
    • interleaving of compute jobs and transfers. may help montage.. but won't help rosetta
    • whether we should include the new pegasus 4.2 features.
  • Cleanup Algorithm
  • Glacier Backups for NFS?
    • instead of using two qnaps, just have one and use other for duplicates
    • we need a place for backups
    • currently the QNAPS are 18TB each with raid 6. Raid 10 is a better configuration on the QNAP according to the forums. This means though we will have half the space.
      • have one qnap for scratch
      • have other qnap for storage - the storage will be backed upto glacier. right now QNAP only support S3. Support for glacier is coming.
    • ewa and richard think glacier backups are a good option.
      • there might be a purge policy required on glacier.
  • Precip Paper
    • change tracking on
    • use dropbox
    • broadcast when you making a new version.

June 10th, 2013

- Pegasus Development

- change to dax handling

- fix of stdout 

- regex based replica catalog. 

- changes to pegasus-statistics for aggregate statistics

 

Pegasus  Lite Paper

- compute data between s3 and local disk.

- compute costs for the runs ? 

- have data outside 

- local cache for the S3 client ??  could affect the rosette cache. 

 - change the rosetta workflow.

 - if there are a lot of small files.

 - reading parts of files.

- Ewa will send her version of the changes.

 

Sudharshan Algorithm for Cleanup

  • Greedy appraoch planned
  • will try implementing a version and show the different executable workflows created


June 3rd, 2013

Pegasus Lite Paper

  • Breakdown of the runtimes , experiments
    • In case of sharedfs, the kickstart runtimes in the breakdown file will be longer
    • for the S3 case we can calculate the S3 transfer time by calculating the difference between the cumulative runtimes
    • doing two experiments rosetta(cpu intensive) and montage( io intensive)

Pegasus Development

  • Java DAX API issues
    • might be some bugs in there.

Precip Paper

  • Ewa wants a link to pegasus website in the paper.
  • have more logical thinking in the paper, like reliability and repeatability
  • Sepideh adding some new figures to the paper.
  • Maciek will provide an experiment use-case for the paper.

Stampede and Corral Annual Reports

  • Karan and Mats will be working on these

Sudarshan's Project

  • Going to look into providing a cleanup algorithm that meets a given storage constraint
  • Will look at the static problem of inserting dependencies into the workflow to achieve a solution

PMC Paper

  • on amazon
  • with clustering and pmc

Shirts

  • Should get the logo sample this week, once we approve then we can order shirts

dV/dT

  • Rafael is working on a draft of the data collection and modeling paper
  • We are planning on publishing data, will start drafting a format this week

May 2013

May 20th, 2013

Confluence is going slow. Mats is going to look.

Analytics are set up on Confluence now.

Pegasus Transfer

  • Mats committed a new version that has support for 2-stage transfers

Pegasus S3 Client

  • Gideon changed .s3cfg to .pegasus/s3cfg

Pegasus Lite Paper

  • Mats is working on the experiments
  • We have two weeks to the deadline

PMC Paper

  • Experiments on Amazon comparing Pegasus, Pegasus w/ Clustering, PMC alone

Pegasus Service

  • Finished setting up users and test suite
  • Next is a quick-and-dirty ensemble manager implementation
  • Gideon is going to commit a change to Pegasus that removes the dashboard components. They will live in the pegasus-service repository from now on.

Summer Student

  • Need to think up a project. Needs to be research-oriented and relatively small.
  • Cleanup? Precip? 

Contacting users

  • Find out if they need anything.

Examples

  • Simple examples in Perl, Python and Java
  • Gideon will add them to the examples in the pegasus Git repo

April 2013

April 22nd, 2013

Pegasus 4.2.1 Release
  • monitord prescript handling fixed
    • pegasus-analyzer should detect prescript failures, and the prescript exitstatus should be logged in the database
    • pegasus-statistics was updated for the job instance report
  • pegasus planner
    • need to confirm all checkin's are complete
  • do we want to get LIGO to do a test or just release?

Pegasus statistics across workflows - Rajiv

Pegasus Lite Paper

  • Mats will do the runs on Amazon
  • Karan will work on paper when he comes back

pegasus-hold and pegasus-release

  • any difference between doing a hold on the dagman directly or pegasus-dagman
  • we need to do more investigations on monitord

BOSCO

  • Mats is trying to run on HPCC
  • a single job is running fine.

April 8th, 2013

Pegasus 4.2.1 Release
  • Work on it towards this week
  • monitord prescript issue to fix
Pegasus 4.3

Pegasus Posters

  • One at XSEDE
  • joint one with BOSCO team

Pegasus Lite Paper

  • Submission to IEEE Big Data

New Programmer Hire

  • expanded posting on confluence
  • New Programmer Hire
  • will send out to HPC Wire , RENCI and USC SC Connect

April 1st, 2013

Pegasus Lite Paper

  • Waiting on Ewa
  • Not much we can do about the IEEE conference. The page limit is 8 , the current size of the paper.

XSEDE Poster

  • Pegasus Poster. Karan will send update
  • Also a joint Pegasus BOSCO poster
  • Also as part of that we will get the MPI workflows up and running through Pegasus and BOSCO

Pegasus Development

  • Bypass of staging input files for Pegasus Lite Case
  • Inplace cleanup bug fixes done.
  • pegasus-s3
    • gideon checked in changes of copy from one file to another
    • mats adds a pegasus transfer
  • workflow cleanup nodes
    • separate cleanup node in the workflow
    • for hierarchal workflows we only delete the outermost workflow
    • what happens if no output-site specified
      • the ligo case!
  • backward compatiblity for LIGO
  • Pegasus Dashboard
    • general javascript updates
  • Generic Pegasus Slides
    • 2-3 slides.



 

March 2013

March 25th, 2013

  • Pegasus Lite Paper Submission
  • Pegasus-statisitcs
    • Waiting on Scott to get back with the list of metrics
    • Rajiv will be working on it
  • pegasus-s3 changes
    • we want to be able to copy output files from one s3 bucket to another
    • requires changes to pegasus-transfer and pegasus-s3
  • final node for cleaning up remote directories
    • also related is getting the cleanup algorithm working when we bypass first level staging.

March 18th, 2013

  • Mats has an RPM almost sorted out for LIGO that does not require us to have PYTHONPATH set. Instead the libraries go into standard locations
  • Karan is testing this RPM at on spice-dev1 and has setup a page with instructions on how to submit a test workflow to VIRGO
  • Statistics across root workflows
    • earlier gaurang had generated statistics for scec runs by hand... executiing queries on the msql command line
    • he does not have the queries documented anywhere
    • this is something we have talked about in context of 4.3 with Rajiv
    • will follow up with scott on wednesday's call
  • 4.2.1 release
    • backward compatibility for LIGO . still to be done
    • probably next week after the pegasus annual report
    • RPM to handle native python installation
  • Pegasus Annual Report
    • Karan will work on it this week
    • Try to follow the same template as earlier.

March 4th, 2013

  • Sent link on DAGMan metrics to DAGMan Metrics Reporting to Ewa
  • Metrics for Rob Quick's workflow
  • Gideon pushed out kickstart changes
  • Rajiv has pushed changes to the queries for the dashboard.
  • Setup meeting with Jaime and Derrick at OSG AHM to discuss
    • remote_initialdir
    • extra attributes for glite/bosco submissions
    • mpi workflows.
  • OSG Poster to be made this week. And 4.2 Release slides.

February 2013

February 11th, 2013

Direct submission of workflows to PBS

  • Glite submission in Condor. We setup a VM that hosts a PBS scheduler and using that too test
  • Karan prepared an example for 4.2 that can be used to submit directly to local PBS using the glite interfaces in Condor
    • the remote_initialdir  / +remote_iwd  does not work
      • problem for MPI codes
      • for the time being, the example prepared relies on kickstart to change the directory before launching a job
    • there is also a ssh style that allows us to use BOSCO to do remote submissions using SSH to a PBS cluster
      • that one also has the issue of remote initialdir

 - jobstate.log refactoring. 

 - data transfer ( support for globus online) 

- lightweight tracing

 -  task stats. net link socket pegasus-kickstart . how much memory the task used and io used. 

 - add task stats to kickstart

 - ptrace

 - trace  linux equivalent is system tap

 

- dashboard improvements

 - single api for clients

 - last week drop down

 - performance run on large workflows.

 

February 4th, 2013

  • CCGrid / Pegasus Lite Paper
    •  Performance section
    •  remove the experiments section?
    •  OR
    •  extra experiments section 
    •  have the squid proxy cache
    • find a workshop to submit the paper
  • Cloud Paper
    •  Ewa is working on it.

  • Git HUB Migration
    •  - couple of branches like monitord , pmc and dang are branches
    •  - svn will be made read only . 
    •  - update the website with all the development information
    •  - bamboo scripts
    •  - documentation ( long term )
    •  - nightly builds
  • SSH Submission
    •  - gsissh submission for blue waters
    •  - ssh to blue waters is required for OTP
    •  - passing of parameters to PBS
    •  - SSH key
    •  - ssh agent.
    •  - queue keyword
    •  - Batch session
    •  - submit jobs to HPCC
    •  - Gideon will do that. 

  • monitord memory explosion
    •  - long term for monitord 
    •  - pegasus-dagman replacement 

  •   minor release 4.2.1
    •  - potential monitord bug issue
    •  - long term dagman replacement

  • Response time for metrics page
    •  - occasionally it is slow
  • No labels